[GH-ISSUE #199] KEUN; COMMENT issue in detailview #97

Closed
opened 2026-03-23 20:31:50 +00:00 by mirror · 1 comment
Owner

Originally created by @kdenturc on GitHub (Feb 29, 2024).
Original GitHub issue: https://github.com/RADar-AZDelta/Keun/issues/199

Originally assigned to: @BostoenToby on GitHub.

If you switch between concepts in detailview than comment from previous datapoint will appear
If you want to add this comment, I need to click enter
But if you do this 5 times, you end up with 5 enters in your _usagi.csv download, which gives bugs
image

would be nice to remove the enters in your download
tx!

Originally created by @kdenturc on GitHub (Feb 29, 2024). Original GitHub issue: https://github.com/RADar-AZDelta/Keun/issues/199 Originally assigned to: @BostoenToby on GitHub. If you switch between concepts in detailview than comment from previous datapoint will appear If you want to add this comment, I need to click enter But if you do this 5 times, you end up with 5 enters in your _usagi.csv download, which gives bugs ![image](https://github.com/RADar-AZDelta/Keun/assets/98580512/8636cf94-f5f6-428f-b6f1-98b0cdbb3701) would be nice to remove the enters in your download tx!
mirror 2026-03-23 20:31:50 +00:00
  • closed this issue
  • added the
    bug
    label
Author
Owner

@BostoenToby commented on GitHub (Mar 6, 2024):

This issue has been fixed. If you place an enter in your comment text, this will replace this with a space in the row.

<!-- gh-comment-id:1981816341 --> @BostoenToby commented on GitHub (Mar 6, 2024): This issue has been fixed. If you place an enter in your comment text, this will replace this with a space in the row.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
RADar-AZDelta/archived-Keun#97
No description provided.